RECONDITIONING FOR AIR CONDITION


INSPECTED MECHANICAL AND ELECTRIC PARTS BEFORE STARTING

INSPECTED MECHANICAL AND ELECTRIC PARTS BEFORE STARTING

RECOVERY REFRIGERANT FROM SYSTEM

‌RECOVERY REFRIGERANT FROM SYSTEM

‌OPEN CONDENSOR AND CHECK DEFECTIVE CONDITION

‌IN CASE OF CONDENSOR OUTLET VALVE, WELDING UP AND REPAIR 
CONDENSOR OUTLET

IN CASE OF CONDENSOR OUTLET VALVE, WELDING UP AND REPAIR
CONDENSOR OUTLET

N2 LINE BLOWING AND PRESSURE/LEAKAGE TEST

‌N2 LINE BLOWING AND PRESSURE/LEAKAGE TEST

‌VACUMED BY VACUME PUMP FOR VACUME TEST

‌RECHARGED REFRIGERANT FROM RECOVERED ONE

‌RUNNING TEST WITH SHIP STAFF



ALTERNATOR AND EL. MOTOR RECONDITIONING


‌GENERAL INSPECTION ONBOARD AND DISMENTLED ALTERNATOR 
STATOR,  ARMATURE

‌‌GENERAL INSPECTION ONBOARD AND DISMENTLED ALTERNATOR‌
STATOR,  ARMATURE

‌OFF-LANDED AND CARRIED TO SHORE WORKSHOP

‌INSPECTED STATOR AND ARMATURE COIL

‌‌INSPECTED STATOR AND ARMATURE COIL

‌‌INSPECTED STATOR AND ARMATURE COIL

‌DISMENTLED OLD STATOR COIL AND CHEMICAL CLEANING BEFORE REWINDING

‌DISMENTLED OLD STATOR COIL AND CHEMICAL CLEANING BEFORE REWINDING

‌REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL

‌REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL

‌‌REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL

‌‌REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL

‌‌REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL

‌‌REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL

‌RETURNING THE ALTERNATOR STATOR COIL AND ARMATURE ONBOARD

‌RETURNING THE ALTERNATOR STATOR COIL AND ARMATURE ONBOARD

‌INSTALLATION ONBOARD

‌INSTALLATION ONBOARD

‌‌INSTALLATION ONBOARD

‌‌INSTALLATION ONBOARD

‌‌INSTALLATION ONBOARD

‌‌INSTALLATION ONBOARD

‌RUNNING TEST WITH SHIP STAFFS

‌RUNNING TEST WITH SHIP STAFFS