INSPECTED MECHANICAL AND ELECTRIC PARTS BEFORE STARTING
INSPECTED MECHANICAL AND ELECTRIC PARTS BEFORE STARTING
RECOVERY REFRIGERANT FROM SYSTEM
RECOVERY REFRIGERANT FROM SYSTEM
OPEN CONDENSOR AND CHECK DEFECTIVE CONDITION
IN CASE OF CONDENSOR OUTLET VALVE, WELDING UP AND REPAIR
CONDENSOR OUTLET
IN CASE OF CONDENSOR OUTLET VALVE, WELDING UP AND REPAIR
CONDENSOR OUTLET
N2 LINE BLOWING AND PRESSURE/LEAKAGE TEST
N2 LINE BLOWING AND PRESSURE/LEAKAGE TEST
VACUMED BY VACUME PUMP FOR VACUME TEST
RECHARGED REFRIGERANT FROM RECOVERED ONE
RUNNING TEST WITH SHIP STAFF
GENERAL INSPECTION ONBOARD AND DISMENTLED ALTERNATOR
STATOR, ARMATURE
GENERAL INSPECTION ONBOARD AND DISMENTLED ALTERNATOR
STATOR, ARMATURE
OFF-LANDED AND CARRIED TO SHORE WORKSHOP
INSPECTED STATOR AND ARMATURE COIL
INSPECTED STATOR AND ARMATURE COIL
INSPECTED STATOR AND ARMATURE COIL
DISMENTLED OLD STATOR COIL AND CHEMICAL CLEANING BEFORE REWINDING
DISMENTLED OLD STATOR COIL AND CHEMICAL CLEANING BEFORE REWINDING
REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL
REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL
REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL
REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL
REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL
REWINDING STATOR COIL AS ORIGINAL SPECIFICATION BY ROUND COIL
RETURNING THE ALTERNATOR STATOR COIL AND ARMATURE ONBOARD
RETURNING THE ALTERNATOR STATOR COIL AND ARMATURE ONBOARD
INSTALLATION ONBOARD
INSTALLATION ONBOARD
INSTALLATION ONBOARD
INSTALLATION ONBOARD
INSTALLATION ONBOARD
INSTALLATION ONBOARD
RUNNING TEST WITH SHIP STAFFS
RUNNING TEST WITH SHIP STAFFS